Ensuring Wall Stability in the Course of Blasting at Open Pits of Kyzyl Kum Region
https://doi.org/10.17073/2500-0632-2020-3-235-252
Abstract
Involvement of deep deposits in mining predetermined the trend of development of open pit mining towards increasing the depth of open pits. The main limitation imposed on drilling and blasting in the near-contour zone of an open pit is the need to protect the pit walls and engineering structures on the walls from seismic effects of huge blasts. As practice shows, the most effective and proven method of protecting pit walls is the use of blasting by presplitting method, creation of a shielding gap and a shielding layer of blasted rock mass, i.e. pre-splitting of the pit walls, preceding the huge blast. Therefore, the study of stress-strain state of the near-contour rock mass, determination of the parameters of blastholes for edge pre-splitting (preliminary shielding gap formation) in open pits is an urgent task. The analysis of the pit wall design and stress-strain state of rock mass at Kokpatas deposit exploited by Navoi Mining and Metallurgical Combine allowed to determine the model, as well as the method for calculating stress-strain state of the rock mass. When assessing stability of the pit walls, an approach known as the displacement method was used. Applying the boundary integral equations method allowed to develop an algorithm for calculating stresses in the rock mass for the conditions of Kokpatas deposit. A technique has been developed for experimental studies of blasting contour blasthole charges (blasting by pre-splitting method) using models, allowing to study fracturing on volumetric models and wave interaction by the method of high-speed video recording of the blasting process in transparent models, as well as to determine the parameters of stress waves during blasting in samples of real rocks. A method for formation of stable pit wall slopes, an excavator method for bench pre-splitting on ultimate envelope (contour) of a pit, and a method for initiating blasthole charges in the near contour zone of a pit have been developed and implemented in the industry.
About the Authors
Sh. Sh. ZairovUzbekistan
Navoi
Sh. R. Urinov
Uzbekistan
Navoi
R. U. Nomdorov
Uzbekistan
Karshi
References
1. Shemetov P.A., Bibik I.P., Isakov M.M. Current state and problems of drilling and blasting in deep open pits in Uzbekistan. Gorniy Vestnik Uzbekistana. 2010;(4):12-19. (In Russ.)
2. Kuchersky N.I., Lukyanov A.N., Demich L.M. et. al. Improvement of opencast mining methods for endogenous deposits of complicated structure. Tashkent: FAN Publ.; 1998. 254 p. (In Russ.)
3. Shemetov P. A. Improving efficiency of using subsoil resources in development of deposits. Tashkent: FAN Publ.; 2005. 122 p. (In Russ.)
4. Malgin O. N., Kustov A. M., Shemetov P. A. Improving blasting operations in the Navoi MMC. Gorniy Vestnik Uzbekistana. 2002;(3):9-12. (In Russ.)
5. Rubtsov S. K., Shemetov P. A. Control of blasting impact on a rock mass in open-pit mining. Tashkent: FAN Publ.; 2011. 400 p. (In Russ.)
6. Typical design of drilling and blasting operations at the open pits of the Central Mining Enterprise of the NMMC. Zarafshan; 2020. 20 p. (In Russ.)
7. Kholikulov Kh. Sh. Blasting by presplitting method: increasing stability of high walls and decreasing watering of subsequent drilling. Gorniy Vestnik Uzbekistana. 2009;(1):117–120. (In Russ.)
8. Kuchersky N.I. Modern methods for development of primary gold deposits. Moscow: Ruda i Metally Publ.; 2007. 696 p. (In Russ.)
9. Benergy P. Butterfield R. Boundary element method in applied sciences. Translated from English, Moscow: Mir Publ.; 1984. 494 p. (In Russ.)
10. Silkin A. A., Koltsov V. N. Geotechnical analysis and wall deformation control systems at the Muruntau open pit. Gorniy Vestnik Uzbekistana. 2002;(4):17-22. (In Russ.)
11. Guter R.S., Ovchinsky B.V. Elements of numerical analysis and statistical analysis of experimental results. Moscow: Nauka Publ.; 1970. 434 p. (In Russ.)
12. Paine Rolf S., Holmes D. K., Clark Harry E. Presplit Blasting at the Niagara Power Project. The Explosives Engineer. Wilmington, Delaware, USA. 2003;39(3):72-92.
13. Rossmanith H. P. The Mechanics and Physics of Advanced Blasting-Waves, Shocks, Fracture, Damage, Impact and Profit. Short Course. FragBlast. 2006;(8). 214 р.
14. Selberg H. L. Transient compression waves from spherical and cylindrical cavities. Archive for physics. 1995;5(7):307-314.
15. Ahmed R. Comportement et Fragmentation Dynamique des Matérieaux QuasiFragiles. Application à la Fragmentation des Roches par Explosifs; Thèse de Doctorat de l'Ecole Nationale Supérieure des Mines de Paris; 2004. 210 p.
16. Zairov Sh. Sh., Urinov Sh. R., Ravshanova M. Kh. Ensuring wall stability in the course of blasting. Monograph. Germany: LAP LAMBERT Academic Publishing; 2020. 175 p. (In Russ.)
17. Zairov Sh. Sh., Urinov Sh. R., Ravshanova M. Kh., Nomdorov R. U. Physical and technical assessment of pit wall stability taking into account the drilling and blasting method used. Monograph. Bukhoro Publ. House; 2020. 175 p. (In Russ.)
18. Urinov Sh. R., Zairov Sh. Sh., Tukhtashev A. B. Theoretical substantiation of methods for assessing the stability of slopes of fractured rocks. Techika. 2020;(2):49-54. (In Russ.)
19. Bibik I. P., Sytenkov D. V. Optimization of parameters of drilling and blasting operations. Mining journal. 2007;(5):48-51. (In Russ.)
20. Shemetov P. A., Bibik I. P. Physical and technical substantiation of the parameters of blasting operations in deep open pits. Gorniy Vestnik Uzbekistana. 2011;(1):24-36. (In Russ.)
21. Bibik I. P. Selection and substantiation of drilling and blasting parameters for increasing efficiency of mining-and-transport equipment in deep open pits. Ph.D. thesis in Engineering Science. Navoi; 2003. (In Russ.)
Review
For citations:
Zairov Sh.Sh., Urinov Sh.R., Nomdorov R.U. Ensuring Wall Stability in the Course of Blasting at Open Pits of Kyzyl Kum Region. Mining Science and Technology (Russia). 2020;5(3):235-252. https://doi.org/10.17073/2500-0632-2020-3-235-252